Example for planning and implementing a project.

Project Description

  • New office building with room automation for 136 rooms over 4 floors as well as preparing the appropriate primary plants.
  • Each floor is leased by another tenant and has its own occupancy and use, i.e. the room operating mode as well as associated room setpoints, lighting per floor with central operation, and emergency function over all floors.
  • Blinds control for each facade, including protection, service, and emergency function over all floors, a central weather station, demand-control of primary plants.
  • Schedulers together with a calendar for room operating modes and lighting for each floor, superposed functions on a monitoring device.
  • Primary plants for air handling, heat generation and distribution as well as central distribution of refrigeration on equipment rooms.
  • Primary plants and general: 5 PXC4.E16-2 and 5 PXC5.E003
  • Desigo room automation stations: 120 DXR2.M and 1 DXR2.E18
  • Network infrastructure: Visualization and monitoring in the event of failure

Functional display of an example topology

Planning and implementation, IP network

Core level

A core switch is not needed since everything is located on one IP segment.

Distribution level

In the distribution level, in the riser zones, i.e. floor distributors:

  • Unmanaged layer 2 switches are planned that are connected with copper cable
  • A managed layer 2 switch is planned for network diagnostics and troubleshooting where a management platform is connected. An unmanaged layer 2 switch can be used as well if the customer has no special requirements.

BACnet MS/TP networks can have a max. cable length depending on the set baud rate. If the overall length is, however, exceeded, a new BACnet network must be created and connected via a BACnet MS/TP IP router to BACnet/IP over the Ethernet.

The rules apply again for BACnet/IP networks, i.e. the Ethernet network must be installed as an unmanaged layer 2 switch. Of course, a PXC.. can integrated in the given zones to control primary plants, depending on building planning.

IP/VLAN overview

Network designation

Network

Address range

Building automation and control

192.168.11.0/24

192.168.11.2….192.168.11.254

 

Planning and implementation, BACnet networks

A BACnet internetwork is built using a multiple BACnet networks. All BACnet/IP capable Desigo devices communicate on the same UDP port, e.g. 0xBAC0.

The BACnet MS/TP IP router connects the BACnet/IP network to the different BACnet MS/TP networks on the floors. Note that each network must receive a unique network number.

Local and global broadcasts are not critical for this amount of devices, rooms, and plants, i.e. BBMD configuration is not required.

Each Desigo PXC.. automation station should have FDT functionality for maintenance and diagnostics and remote access.

Planning and implementation, HVAC and room automation

Plant scope:

  • Desigo PXC4.E16-2/PXC7 to control primary plants.

Building scope:

  • Desigo PXC5.E003 for superposed functions, e.g. scheduler for occupancy and use times by floor and monitoring Desigo room automation stations.
  • Desigo DXR2.E18 for central functions over multiple floors.

Floor scope:

  • Desigo DXR2.E exclusively for central functions.
  • Desigo DXR2.M.. for rooms with HVAC, lighting, and blinds, or room segments with HVAC.
  • PXC5.E003/PXC7/PXG3.M BACnet-MS/TP IP router.

If project implementation permits (from a cost standpoint), we recommend distributing monitoring of Desigo room automation stations or schedulers for the floors over different monitoring units (PXC5.E003).

Planning and implementation of central functions

Central function

1st floor

Tenant A

Floor 1

Tenant B

Floor 2

Tenant C

Floor 3

Tenant D

The entire building, across floors

Hardware

AS1001

AS2001

AS3001

AS4001

AS5001

Central weather station

 

 

 

 

CenWthStn

Central setpoint generation via seasonal compensation

 

 

 

 

CenSsn

Central operating mode determination

CenOp_EG

CenOp_1OG

CenOp_2OG

CenOp_3OG

 

AS500

Scheduler for room operating mode

SchedOp0

Scheduler, room operating mode ground floor

SchedOp1

Scheduler, room operating mode 2nd floor

SchedOp2

Scheduler, room operating mode 3rd floor

SchedOp3

Scheduler, room operating mode 4th floor

 

Central operation lighting

CenOpLgt_EG

CenOpLgt_1OG

CenOpLgt_2OG

CenOpLgt_3OG

 

AS500

Scheduler for lighting, building occupancy

SchedLg0

Scheduler, lighting occupancy, ground floor

SchedLg1

Scheduler, lighting, building occupancy, 2nd floor

SchedLg2

Scheduler, lighting, building occupancy, 3rd floor

SchedLg3

Scheduler, lighting, building occupancy, 4th floor

 

AS500

Scheduler for lighting, system operation

SchedLg6

Scheduler, lighting system operation Ground Floor.

SchedLg7

Scheduler, lighting system operation 2nd floor.

SchedLg8

Scheduler, lighting system operation 3rd floor.

SchedLg9

Scheduler, lighting system operation 4th floor.

 

Central emergency function lighting

CenEmgLgt_EG

CenEmgLgt_1OG

CenEmgLgt_2OG

CenEmgLgt_2OG

 

Central emergency lighting (overall)

 

 

 

 

CenEmgLgt

Central shading operation

CenOpShd_EG

CenOpShd_1OG

CenOpShd_2OG

CenOpShd_3OG

 

AS500

Scheduler for shading, building occupancy

SchedSh0

Scheduler, shading, occupancy, ground floor

SchedSh1

Scheduler, shading, occupancy, 1st floor

SchedSh2

Scheduler, shading, occupancy, 2nd floor

SchedSh3

Scheduler, shading, occupancy, 3rd floor

 

AS500

Scheduler for shading, system operation

SchedSh6

Scheduler, shading system operation ground floor.

SchedSh7

Scheduler, shading system operation 1st floor.

SchedSh8

Scheduler, shading system operation 2nd floor.

SchedSh9

Scheduler, shading system operation 3rd floor.

 

Central emergency shading (overall)

 

 

 

 

CenEmgShd

Central protection function shading

 

 

 

 

CenPrtShd

Central service function shading

CenSrvShd_EG

CenSrvShd_1OG

CenSrvShd_2OG

CenSrvShd_3OG

 

Central facade shading west

 

 

 

 

CenFcdShd_W

Central facade shading south

 

 

 

 

CenFcdShd_S

Central facade shading east

 

 

 

 

CenFcdShd_E

Hot water supply chain

 

 

 

 

SplyHw

Supply chain chilled water

 

 

 

 

SplyChw

Recommendation: Network components

  • Siemens SCALANCE XB005 – Optional, as edge switch for cabling the BACnet-MS/TP IP router PXG3.M in the event the maximum cable length for the BACnet-MS/TP network is exceeded.
  • Siemens SCALANCE XB005 - At the distribution level in the riser zones.
  • Siemens SCALANCE XB205 - At the distribution level with port mirroring for diagnostics.

IT security and IT basic protection

The elements of infrastructure, IT systems, networks, and applications must be discussed under the aspects of security and appropriate measures need to be developed. Customer, domestic, or industry guidelines and directives must be observed under all circumstances.

For additional details, see Desigo Cybersecurity Guidelines Application Guide (A6V14142297) and Practical Guide on IP Networks in Building Automation and Control Systems (CM110668).

Summary

The following tables show how to depict all devices and network components in a small project.

Plant category

Number of IP devices

Number of MS/TP devices

PXC primary plants

5

 

DXR2 individual room control & central functions

1

120

PXC5.E003 system controller

5

 

Reserves 5%

1

6

Amount

12

126

Network components

Type Siemens

Layer

Managed

No.

Edge switch per floor

XB005

2

No

4

Distribution switch in the equipment rooms

XB200

2

Yes

1

Description

2nd floor

DXR2

3rd floor

DXR2

4th floor

DXR2

5th floor

DXR2

Primary plant

System level

VLAN

VLAN 01

VLAN 01

VLAN 01

VLAN 01

VLAN 01

VLAN 01

UDP port

BAC0

BAC0

BAC0

BAC0

BAC0

BAC0

Subnet mask

255.255.255.0

255.255.255.0

255.255.255.0

255.255.255.0

255.255.255.0

255.255.255.0

Default gateway

192.168.11.254

192.168.11.254

192.168.11.254

192.168.11.254

192.168.11.254

192.168.11.254

Engineering notebook XWP/ABT

 

 

 

 

 

192.168.11.250

Number of DXR2

30

30

30

30

 

 

MS/TP segment/ BACnet network number

1

2

3

4

 

 

Baud rate (kBit/s)

115200

115200

115200

115200

 

 

PXC5.E003 start address

0

0

0

0

 

 

MS/TP addressing, Max.Master / Max.Info

30/50

30/50

30/50

30/50

 

 

SNMP, read community

enabled, public

enabled, public

enabled, public

enabled, public

 

 

IP address PXC5.E003

192.168.11.10

192.168.11.20

192.168.11.30

192.168.11.40

 

 

Central functions for the overall building (DXR2.E18)

 

 

 

 

 

192.168.11.200

System controller monitoring floors (PXC5.E003)

 

 

 

 

 

192.168.11.201

Number of PXC

 

 

 

 

5

 

IP address range PXC primary plants from…

 

 

 

 

192.168.11.100

 

IP address range PXC primary plants ...to

 

 

 

 

192.168.11.199

 

IP address range Mgmt'stations Desigo CC from…

 

 

 

 

 

192.168.11.210

IP address range Mgmt'stations Desigo CC f...to

 

 

 

 

 

192.168.11.215