- Remove the cap from the PM actuation port.
- Screw the actuator onto the PM valve actuation port by hand.
- Tighten using a 17 mm wrench:
Torque: 8 Nm
Both pilot lines (L1 and L2) get terminated at the double pneumatic actuator with bleedvalves.
Refer to the installation instructions for details.