- Remove the cap from the PM actuation port.
- Screw the actuator onto the PM valve actuation port by hand.
- Tighten using a 19 mm wrench:
Torque: 8 Nm
- Screw the actuator's tee fitting onto the actuator body by hand.
- Screw the pilot hoses and/or the bleed valve at the end of the pilot line onto the L6 outlets of the tee fitting by hand.
- Adjust the position of the hoses to guide the actuator's tee fitting.
- Tighten the tee fitting using a 14 mm wrench:
Torque: 5 Nm
- Tighten the pilot hoses and/or the bleed valve using a 14 mm wrench:
Torque: 5 Nm
Close the pilot line with a bleed valve.
Refer to the installation instructions for details.