Inspect the installation locations on-site and verify your Thread network plan.
Verify the following during the site survey:
- Is access to 230 V power and to Ethernet network available and within max. cable reach?
- Is the next device in a signal path visible from the previous device? Is there a clear line of sight without any obstacles between devices?
- Are there any changes or obstacles you did not consider in your off-site planning? For additional information on obstacles see 'Obstacles'.
- Are there any other wireless networks or devices which can cause interference? For additional information on interference see 'Interference'.
- Is the Thread signal strength sufficient?
- Is the Thread network planning robust enough for an operational building (with more people, wireless devices, etc.)?
Document the network to include device details, location, and photographs from the planning phase to the final deployment.