Review the final Thread network off-site plan after the planning phase and recheck one last time after completing the following steps:

  • Draw the preliminary grid and the TME/TBR locations
  • Identify obstacles
  • Adjust the TME/TBR locations
  • Plan additional TME/TBR locations
  • Decide if TMEs or TBRs can be used at the identified locations

Mark or note possible exceptional cases to verify them on-site. See figure below.

Final Thread network plan after on-site verification

 

TBR

TME

SED

Additional TME may be needed