After the Thread system has successfully been planned, commissioned, and installed, proceed as follows:
- Test the system using the Site Acceptance Test (SAT) template.
For details on the SAT template, see 'Related documentation'. - Handover the system to your customer. Handover documentation may include the following:
- Project specification and system configuration
- Floorplan including Thread network plan
- Thread network overview
- Site Acceptance Test
- Have the customer document that the handover is complete and the system is fully functional and accepted.
NOTICE
The customer must acknowledge with a valid signature that the system is operational. Failure to do so may expose the installer or manufacturer to unnecessary liability, namely if the Thread system does not work after a certain period (e.g. due to changes in device locations or configuration changes to the network by the customer, etc.).