The active data points start collecting time series data at specified time intervals. Activated data points can be discovered with connected devices via Connect Hub.
- You have added a device or equipment with data points.
- In Data Setup, go to Tree view > Structure.
- Select a device or equipment.
- For devices, go to Data points connected to this device.
- For equipment, go to Data points.
- Select the data points you want to activate.
- Select Change status.
- Select Activate from the dropdown list.
- The status is changed.
- Next Steps:
Go to Operations Manager and verify the data points display.
For the next steps in your Building Operator Discovery to Connect Hub migration, go to Post BOD to Connect Hub migration activities.