Step 1 - Tag the BOD data points - Engineering
Building X Migration Guide for Operations Manager Engineering
- Product Family
- Building X
- Content Language
- English
- Content Type
- Technical Documentation > Engineering Documentation
- Document No
- A6V14374875_en--_a
- Download ID
- A6V14374875
- Access level
- Internet
- File Type
- html
Step 1 - Tag the BOD data points- Go to Launchpad > Data Setup.
- Go to Tree view > Structure.
- Select a device or equipment.
- Do one of the following steps:
- For devices, go to Data points connected to this device.
- For equipment, go to Data points.
- Select one or multiple data points.
- Select Tag data points.
- From the Custom tag section, select Create tags.
- Enter the custom Tag name and Tag value information. For example: BOD
- Confirm with Save.