Changing the state from new to open logs all tests conducted on the devices. The information is synchronized with Fire Manager.

  • A new test plan is available with state New.
  1. Select a site and then select Test plans on the vertical navigation.
  1. From the list of displayed plans, navigate to the test plan whose state is to be changed and select and select Edit.
  1. In the Edit test plan dialog box, select Open from the Status drop-down list.
  1. Enter a comment on any changes in the Comments text field.
  1. Select Update.
  • The test plan is available for editing.
  • All manual tests are logged as of now and Portal updated using the sync function in Fire Manager.
Type and source of hazard

Test plans are available and can be edited in Fire Connect mobile app.