Observe the following notes when commissioning:
- Use the offline simulator to ensure that the program fully meets the onsite requirements.
- The control logic and controller adjusting performance depend largely on the programming.
- Ensure power supply and correct wiring of the controller and its peripherals.
- Power-off retentive parameter are saved immediately once changed. Note: Data writing may not be successful at the moment of power failure.