In Asset Essentials, pieces of equipment are referred to as assets.

  • You are in Asset Essentials.
  • The building structure has been created in Data Setup.
  • An asset has been created in Asset Essentials.
  1. Go to Assets.
  1. Select the asset name > Edit.
  1. In the editing dialog, scroll down until you see the Connect to field.
  1. Select Operations Manager.

Other Building X apps will be available in the future.

  1. Select Save.
  • The asset is sent to Building X and Operations Manager as a piece of equipment.
  1. Go to Operations Manager by selecting the link in the Connected to column.
  • The equipment is displayed in Operations Manager, but not linked to a location yet.
    Go to Data Setup to add the piece pf equipment to the correct location.