The commissioning report performs connectivity tests on BAN devices and collects data about the site, building, connected devices and functions, and produces a report for download.

Go to the Desigo Plug and Play Automation application tab Commissioning > System Test to perform a system test. Select Start to launch the tests and after completion select file format of the report to download. An excerpt of from a report is shown below.