The system commissioning must begin with the edge device. Please ensure that the edge device has been installed, is running and connected to the network before commissioning. Activate the edge device by scanning the QR code printed on the front cover.

The edge device does not have a built-in user interface but is managed from the cloud app. During the scanning and drag-and-drop procedure, all necessary data is loaded to the device and configuration is performed.

Edge controller

  • CXE200 Edge controller has been installed, is powered on and has been assigned to a room in the planning step (see Adding floors and rooms).
  1. Select assigned device and click Connect to start commissioning. Please note that the status of the device must be as described under Before you start. Click Next to continue
    .
  1. Click Next and direct the scanner onto the QR code on the product.
  1. The edge device is automatically onboarded. Confirm by clicking Save and then Next.
  • The edge device is automatically configured and is ready to use.

 

Thermostats

  • The thermostat has been installed, configured with a Modbus address and assigned to a room in the planning step (see Adding floors and rooms)
  1. Select the assigned device and click Next to start commissioning.
  1. Set the Modbus address in the designated text field and select Next.
  1. Successful commissioning is indicated by a message that the meter is online.
  • The thermostat is commissioned.

 

Heat/cooling meters

  1. Select assigned device and click Next to start commissioning.
  1. Click Next and direct the scanner onto the bar code on the product. The bar code can also be entered manually in the designated field.
  1. When the code has been registered, a confirmation message is shown. Click Save to continue.
  1. Successful commissioning is indicated by a message that the meter is online.
  • The heat/cooling meter is commissioned.

 

Electric meters

  • The electric meter has been installed, configured with a Modbus address and assigned to a room in the planning step (see Adding floors and rooms)
  1. Select assigned device and click Next to start commissioning.
  1. Set the Modbus address in the designated text field and select Save and then Next.
  1. Successful commissioning is indicated by a message that the meter is online.
  • The electric meter is commissioned.