The following chapter describe the basic installation and configuration sequence for connecting devices of the respective type to the Connect Box. For configuration details please consult the onboarding video at https://www.siemens.com/connectbox/training.
Chapter 5 describes how to physically connect the Connect Box with an existing BAC system and / or devices based on BACnet or LON. Please refer to Chapter 6 for installation instructions for individual devices without connecting to an existing BAC system.
Preparations
- Determine the type of network (communication protocols between the BAC system and technical equipment).
- If possible, the IT planners for a diagram of the communication network.
- Identify where and how the BAC system connects to the building network in order to connect it with the Connect Box.