To set a period in Energy Manager, carry out the following instructions:

1273456
  1. Select Dashboard, Site details or Emissions in the vertical navigation.
  1. Select Time filter (1) on the Dashboard.
  • The Period: Custom date range dialog opens.
  1. Select the required period with one of these options:
  • Select a preset date (2).
  • The custom date range changes accordingly.
  • Select custom Start and End dates (3) from the date picker.
  • Open Advanced options (6), select Rolling start date and Rolling end date (4).
  • The start and end dates will adjust automatically as the calendar changes.
  • Select a (rolling) Start or End date (3) and choose the Duration (5).
  • Depending on which date you changed last, the other date shifts according to the selected duration.
    E.g., if you chose the end date and set duration to 5 days, the start date shifts 5 days backwards. If you chose the start date and set duration to 5 days, the end date shifts 5 days forwards.
  1. Select Apply (7).