Changing the state from new to open logs all tests conducted on the devices. The information is synchronized with Desigo Fire Portal.

  • A new test plan is available with state New.
  1. Select Test plan & report .
  1. Select next to the test plan and then Edit.
  1. In the Edit test plan overview dialog box, select Open from the State drop-down list.
  1. Enter a comment on any changes in the Comments text field.
  1. Select Update.
  • The test plan is available for editing.
  • All manual tests are logged as of now and Portal updated using the sync function in Desigo Fire Portal.
Type and source of hazard

Test plans are available and can be edited in Desigo Fire Connect mobile app.