In order to sync the schedules to BACnet (to be read and written), import the schedule points into the data base.
How to sync BACnet Schedules
- Drag the schedule point(s) to DB Builder.
- Add the point to the schedule.
Make sure to enable Write Schedule or manually add the writeSchedule tag on the policy.
- The schedule syncs whenever there is a change of value.