In order to sync the schedules to BACnet (to be read and written), import the schedule points into the data base.

How to sync BACnet Schedules

  1. Drag the schedule point(s) to DB Builder.
BACnet schedule, drag point to DB Builder.
  1. Add the point to the schedule.

Make sure to enable Write Schedule or manually add the writeSchedule tag on the policy.

  • The schedule syncs whenever there is a change of value.