• Remove the cap from the PM actuation port.
  • Screw the actuator onto the PM valve actuation port by hand.
  • Tighten using a 24 mm wrench:
    Torque: 8 Nm
  • Screw the actuator's tee fitting onto the actuator body by hand.
  • Screw the pilot hoses and/or the bleed valve at the end of the pilot line onto the L6 outlets of the tee fitting by hand.
  • Adjust the position of the hoses to guide the actuator's tee fitting.
  • Tighten the tee fitting using a 14 mm wrench:
    Torque: 5 Nm
  • Tighten the pilot hoses and/or the bleed valve using a 14 mm wrench:
    Torque: 5 Nm

 

Close the pilot line with a bleed valve.

Refer to the installation instructions for details.