Prerequisite

The free-standing rack is installed.

Procedure

  1. Mount the intermediate support upright between the upper and central cross members behind the H2O cylinders.
  2. Unscrew the lower clamp that is preassembled on the intermediate support.
  3. Screw the lower clamp back on the end upright of the free-standing rack at the same height as the upper clamp, which remains attached to the intermediate support.
  4. Then install the pilot piping vertically between the H2O cylinders.

 

For more information on the mounting procedure, refer to the mounting instructions.