Advanced View:

  1. Activate the Advanced View mode.
  1. Click on the Schedulable property's text box to change the schedule level.
  1. Save the changes by clicking the Save button at the bottom right corner.

 

Basic View:

  1. Click on the information icon to open a pop-up window.
  1. Navigate to the schedulables property tag within the window.
  1. Change the level number by selecting the text field.
  1. Apply the changes by clicking the Apply button at the bottom right of the pop-up window.