If the user wants to change the schedule level, they will need to:

Advanced View

Make sure that the advanced view has been activated   

 

The user will select on the text-box for Schedulable, where they can change the schedule level

Once changed, they will need to select on the Save button located on the bottom right

Basic View

Select on the information icon , this will open a pop-up window

The user will navigate to the property tag called schedulables

In there, they can change the level number by selecting on the text-field

Once changed, they will need to select on the Apply button on the bottom right of the pop-up window