The Add Points to Schedule tool allows you to add new schedulable points that are not yet linked to an existing schedule.

How to use Add Points to Schedule

  1. Select a schedule to add schedulable points to.
  1. In the slider menu, click Tools .
Slider menu > Tools
  1. Select Add Points to Schedule and then click OK.
  1. Select the point to add.
  1. To add multiple points, hold Ctrl, select the points and then click OK.

Schedulable

In order for the points to appear in Add Points to Schedule, they must already be configured as schedulable. They need to have the number property tag as schedulable and a level of 2-7 or 9-16 to write to. The recommended level is 15, which is default.

That can be done on the point itself under Point Type or by clone/batch tagging points that need to be scheduled as schedulable:15.