For information on the system compatibility of the Desigo CC management platform, see Desigo CC System Description (A6V10415500).

For information on the system compatibility of the Desigo Insight management station V6.0 SP2, see Desigo Building Automation System 6.0 SP, Technical Principles (CM110664 / 2016-09-20).

For information on the system compatibility of the Desigo Control Point management station, see Desigo Control Point Basic Documentation (A6V11170804).

For the current state of the Valid Version Set (VVS), see the document Desigo_VVS_6.10.48x.pdf.

Glossary

Term

Description

Project data

Desigo engineering and project data required to create runtime systems, but that are no longer needed for operation (offline data).

Runtime system

 

Firmware (loaded) installed on the hardware of the customer plant or software with compiled project data including libraries (online data).

New

New Desigo customer project with no Desigo runtime system and project data.

Extension

Existing plant or installation (existing Desigo runtime system with project data) that is being expanded or extended (e.g., additional buildings).

Migration

Replacement of existing plant or installation (existing Desigo / Visonik / Unigyr / Integral runtime system with project data) by new technology with a change of software and/or hardware.

Upgrade

Functional improvement to existing plant or installation (existing Desigo runtime system with project data) by deploying developments for a new Desigo system version.

Update

Existing plant or installation (existing Desigo runtime system with project data) is updated within the same version (e.g., to eliminate errors with a service pack).

Project data conversion

Online Desigo project data from earlier Desigo versions are migrated to the current ABT/XWP version when opened in ABT/XWP.

During conversion, the existing database structure and/or associated tool landscape is migrated to the latest version. A conversion always impacts all project data of a tool project.

The project data and libraries remain unchanged. The runtime system (online project data) does not change, that is, the original version status remains as is.