Refer to the commissioning instructions for detailed assembly procedures.

  • Mount the SEVR-60 drain valve vertically on the end of a tube (at least 350 mm), using a 27 mm open-end wrench. The draining hole must point downwards.
  • Drain valves have to be fixed in the lowest points of the distribution pipe network.