Preconditions - Basic Documentation - GDB181.1E/BA - GDB181.1EMBA - GLB181.1E/BA

VAV Compact Controller BACnet MS/TP G..B181.1E/BA

Product Family
OpenAir
Product Group
Damper actuators
Content Language
English
Content Type
Technical Documentation > Basic Documentation
Product Version
Status
Valid
Date
2021-10-26
Document No
A6V10631864_en--_g
Download ID
A6V10695831
Stock No.
S55499-D168
S55499-D169
S55499-D506
Product No.
GDB181.1E/BA
GDB181.1EMBA
GLB181.1E/BA
Access level
Internet
File Type
html

Commissioning requirements

The beginning of the commissioning phase assumes that all VAV Compact Controllers are mounted according to the mounting instruction [3] as well as all other devices according to their mounting instructions.

All devices must be connected to the power supply and bus cabling. Power supply and bus cabling must be tested, especially the communication between setpoint sender and setpoint receiver.

Commissioning of VAV Compact Controllers consists of two parts:

  • Commissioning of the VAV control function (cf. sections 5.1 and 5.2),

  • Commissioning of the network integration.

Two basic workflows are supported:

  • Full or partial configuration by a tool (bus configuration and optionally VAV configuration), usually AST20 or ACS941,

  • Full or partial configuration over bus, optionally addressing by push-button.