1. Route all wires out from the outlet box.
  2. When the alarm LED viewing is critical, position the LED mark on the base in the intended direction (Refer to Figure 9).
  3. Make connections directly to the audible base terminals located on the back of the base. Refer to the related Installation/Wiring diagram.
  4. After all bases are installed, check loop continuity. For ABHW-4S loop continuity check, refer to the DPU or SDPU Manual, “Testing a FireFinder-XLS Loop”.
  5. If loop continuity is acceptable, proceed with detector head installation.