Steps:
- Installation should be performed by qualified personnel who have thoroughly read and understood this instruction sheet.
- Disconnect BATTERY and AC on the cabinet prior to working on the equipment.
- Mount FCA2015-U1 as shown using the four screws that are supplied.
- Attach conduit and run wires as required. Wire Size: 12-22AWG
- Connect the Serial Communication Cable to the fire system control unit as required.
- Apply power to system.
- Program for proper operation.
See the Desigo FC2025/2050, FV2025/2050 Configuration manual, Document ID A6V10315023, and Cerberus PRO FC922/924, FV922/924 Fire Detection System Configuration manual, Document ID A6V10333423, for details on programming.
- Check for proper operation.
Quantity | Type |
|---|---|
1 | DACT Board |
4 | Screws |
1 | Instruction Sheet |
1 | Serial Communication Cable |
*4 | 1 ¾” x ¼” Hex Male to Female Standoff |
*Used for FCM2019-U2/-U3 or FCM2035- U2/-U3 only.