Buildings with computer centers require EMC protection management in addition to lightning and overvoltage protection.
If a KNX network is installed in a building of this type, it must be part of the EMC protection management. The EMC protection arrangements must be agreed in detail with the person responsible for EMC protection management.
Index
…
… 44
1
10BaseT 51
A
Abbreviations 7
Access levels 26
ACS790 software 33
Address devices with RMZ operator units 32
Address zones with RMZ operator units 46
Alarms and remote time adjustment 59
Application with zones 74
Area 0 11
Area line 0 11
Area/line address 11
Area/line couplers 14
Areas 1…15 11
Assign device names 30
B
Basic communication settings 35
Block all 54
Bus access method 6
Bus cable 6
Bus load number E 17
Bus topologies and distances 21
C
Cable length 22
Cat5 cable 51
Central bus power supply 20
Central communication units OZW77x 9
Change time and date 36
Changeover based on calendar 68
Changeover via analog input 67
Changeover via digital input 66
Clock time operation 35
Commissioning with RMZ operator units 26
Commissioning, points to check 25
Communication error 64
Communication of process values 40
Consumer 76
CSMA/CA 6
D
Data points 7
Default "----" in series B devices 42
Default values 28
Definition of terms 6
Design engineering procedure 15
Device address 13
Device address and device name 29
Device range Synco 700, Synco living, RXB/RXL, RDG, RDF, RDU 8
Device types 9
Devices with a bus power supply 17
Devices without bus power supply 18
DHCP server 60
Distributed bus power 17
Distributor 76
E
E-characteristic 17
EMC protection management 85
Engineering 15
Engineering large plants 60
Engineering with ACS 60
Engineering with ETS 61
Ethernet 10 Mbps 51
Ethernet cable, crossed 52
Ethernet cable, straight 52
F
Factory settings 28
Fault status message bus 63
Faults and errors, communication 63
Filter settings 54
Filtering, communication areas 56
Filtering, zone addresses 56
G
Geographical zone (apartment) 41
Geographical zone (room) 75
Geographical zone (subzone) 75
H
H/C changeover relay and fault status messages 69
Heating/cooling changeover 65
I
Individual address 12
IP address DHCP 60
IP address, manual 60
IP network administrator 51
IP router as area coupler 53
IP router as coupler to IP network 51
IP routers 14
IP routers to link worlds 53
IP settings with ACS 60
K
KNX bus 6
KNX configuration mode 10
KNX Logo 10
KNX network 11
KNX transmission medium 10
L
Large plants, engineering 60
Large plants, engineering and commissioning 47
Large plants, network topologies 48
Lightning protection 80
Lines 1…15 11
LTE filter table 54
LTE filtering settings 54
LTE telegrams 54
LTE telegrams via couplers and IP routers 57
LTE-Mode 6
M
Main lines 1…15 11
Multiple connections 52
N
Network address 12
Network with RX… room controllers 58
Normal (route) 54
Number of bus devices 16
O
OCI700 service interface 33
One-way communication 59
Overvoltage protection 83
P
Physical address 12
Point-to-point connection 52
Power consumption of bus devices 19
Power supply unit PSU 20
Predefined LTE filter table 55
Producer 76
Product markings 10
R
Read area, line and device address 29
Remote reset of fault 38
RMB795 central control unit as collector 58
Room control combination 70
Room thermostats RDx… 9
Route all 54
RXB/RXL room controllers 9
S
Service tool OCI700.1 33
Set time slave remotely 36
S-Mode 7
Specified distances 22
Subnetwork 12
Supply chains in buildings 76
Switch box 52
Switching Heating/cooling 65
Synco 700 RM…controllers 9
Synco bus devices 9
Synco zoning 39
System time 59
T
Time synchronization 59
Timer function QAW740 37
Two-way communication 59
U
Update process values 79
Z
Zone addresse with QAW740 46
Siemens Switzerland Ltd. Sektor Infrastructure & Cities Building Technologies Division Gubelstrasse 22 6301 Zug Switzerland Tel. +41 41-724 24 24 |
© 2003-2013 Siemens Switzerland Ltd. |